Inside an S3 assessment

From assessment
to action.

See how the report connects an executive overview, detailed recommendations and a roadmap for improvement.

Marina Wonderland · Demonstration report

01 / Executive overview

A shared view
of the destination

The restitution brings together performance by pillar and facility, the strongest practices and the areas requiring attention. Leadership can see the wider picture before exploring the details.

02 / Detailed review

The reasoning
behind the priorities

Each pillar links the criteria reviewed with non-conformities, observations and recommendations. The team can understand what needs to change and the supporting evidence to prepare.

03 / Delivery roadmap

Responsibility
and a next step

Actions are organised by priority, facility and owner, with a target timeframe, indicative budget and status. The plan provides a basis for management review and follow-through.

Three examples from the report

What this looks like
for your facility.

Explore an adapted example of the connection between a finding, a recommendation and an action.

MarinaEnergy & Climate

Finding

Charging readiness and renewable-electricity documentation need a more structured approach.

Recommendation

Document renewable electricity across the relevant meters, assess charging capacity and define a phased plan for lower-emission mobility.

Illustrative action · High priority

Energy transition, charging readiness and low-emission mobility plan

Map electrical capacity, confirm renewable-supply evidence and phase charging infrastructure, with responsibilities and measurable indicators.

Owner
Marina Manager + Technical Director
Target timeframe
90 days
Indicative budget
€120,000
Status in the example
Open
Yacht clubSafety & Asset Integrity

Finding

Medical-emergency readiness requires priority attention alongside fire safety and operational leadership.

Recommendation

Review emergency procedures, training and equipment together, and connect inspections with a tracked plan for corrective action.

Illustrative action · High priority

Crisis management, medical readiness and leadership operating discipline

Review crisis procedures, medical readiness, fire protection, information-sharing routines and management accountability.

Owner
General Manager + HSE Manager + HR Manager
Target timeframe
45 days
Indicative budget
€25,000
Status in the example
Open
Nautical centreEnergy & Climate

Finding

The sailing school needs a clearer energy baseline and a planned approach to efficient equipment.

Recommendation

Establish the operating baseline, document renewable supply and prioritise efficient equipment replacement, considering available incentives.

Illustrative action · High priority

Low-carbon campus and efficient equipment retrofit

Review HVAC and equipment efficiency, then define a phased replacement plan supported by the energy baseline and available incentives.

Owner
School Director + Facilities Manager
Target timeframe
60 days
Indicative budget
€70,000
Status in the example
Open

Adapted from the Marina Wonderland demonstration report. Illustrative examples; budgets and timings require project-specific scoping and validation.

Following through

A plan to revisit,
not just a report to file.

Use the roadmap to agree responsibilities, schedule reviews and gather evidence of completed improvements. A change in recognition is subject to M3’s review of the evidence.

The final scope, actions and implementation assumptions are defined for the destination assessed.